We bring the right people together to challenge established thinking and drive transform in 2020
We bring the right people together to challenge established thinking and drive transform in 2020
We bring the right people together to challenge established thinking and drive transform in 2020
Regnault Project – Consists of 71 contiguous mineral claims covering an area of approximately 23,678 Ha located north-northeast of Chibougamau in the Province of Québec.
Property Location – The Regnault Property is located roughly 130 km north-northeast of Chibougamau, Québec, Canada, in the Baie James Area within NTS Map Sheets 32O01, 32J16, 32P04, centred at roughly 51°03N by 74°05W and covering an approximate area of 3,678 ha. It can be accessed by either helicopter or float plane from the airport in Chibougamau which is serviced by commercial airlines; the Regnault Property is 409 km by road from Val d’Or, Québec; 695 km by road from Montreal.
The Regnault Property comprises an early-stage exploration project of merit which supports further exploration. In addition to the historical work conducted on the Regnault Property, the regional-scale mapping and recent geophysical survey have provided a baseline of information which can be used to target potential mineralization on the Regnault Property. Follow-up geochemical sampling is lacking and, therefore, drilling targets have not been identified yet. Systematic mineral exploration is required across the Regnault Property to identify any mineral potential that may be hosted on the Regnault Property. A property-wide geochemical sampling program is currently in the planning stages.
Based on the geophysics and available Regnault Property information, the following findings are noteworthy:
Because this is an early-stage, grassroots exploration project, there is always the risk that the proposed work may not result in the discovery of an economically viable deposit.